Cryptos chain load tests · perf-1 and c-16 campaigns
Overview
Current bottleneck
Current phase
Headline throughput by test
perf-1 S8000 overload rung, run by run
Decision timeline
Point anywhere in time to see what was done, what worked, who did it and what it led to. Scroll or pinch to zoom, drag to pan, select an event to draw its decision chain. Left and right arrow keys step between events.
Timeline
Every test and run, oldest first. Select a row to open its details.
Test details
Setup, what changed and why, results and charts. The phase filter above applies here too.
Strategies tried
Each optimisation, its effect as measured, and whether it stayed.
Agent conclusions
The campaign ran as five Claude sessions posting to a shared message bus. Key findings per agent, dated, with the bus commit they were posted in.
Incidents and lessons
Halts, measurement traps and safety findings. Safety items are described at a high level only.
Next
The plan and the open questions as of the last update.